Completed Projects
You can find below our projects that we have completed since our establishment for Public and Private Institutions.
KOCAELI MUNICIPALITY – GEBZE SARMAŞIK CADDESI DOĞA MADENCILIK ÖNÜ TOPRAKARME WALL IMALATI (2011)
GEBZE PLASTICISTS ORGANIZED INDUSTRY – TURAL CONSTRUCTION – GEMAK REFRIGERATION MACHINERY FACTORY EARTH REINFORCED WALL MANUFACTURING (2011)
GEBZE PLASTIKÇILER ORGANIZED INDUSTRY – PIMTAŞ PLASTIC FACTORY FRONT EARTH REINFORCED WALL MANUFACTURING (2011)
GEBZE ORGANIZED INDUSTRIAL ZONE (GOSB) – SELÇUK PHARMACEUTICAL WAREHOUSE ADMINISTRATIVE BUILDING FRONT EARTH REINFORCED WALL CONSTRUCTION (2012)
ASO – SINCAN ORGANIZED INDUSTRIAL ZONE 5TH STAGE CONSTRUCTION OF EARTH REINFORCED WALLS (2011-2012)
TCDD – GÜNGEN İNŞAAT VE TIC. LTD.ŞTI – ESKIŞEHIR NATIONAL SOVEREIGNTY INTERSECTION EARTH REINFORCED EDGING AND EARTH REINFORCED WALL DESIGN (2012)
TCDD – GÜNGEN İNŞAAT VE TIC. LTD.ŞTI – ESKIŞEHIR SATILIMIŞOĞLU INTERSECTION DESIGN OF EARTH RETAINING EDGE AND EARTH RETAINING WALL (2012)
TCDD – GÜNGEN İNŞAAT VE TIC. LTD.ŞTI – ESKIŞEHIR ÇILEM INTERSECTION EARTH REINFORCED EDGING AND EARTH REINFORCED WALL DESIGN (2012)
KOCAELI MUNICIPALITY – HASKO İNŞAAT SANAYI VE TICARET A.Ş – SUADIYE ARSLAN BEY CONNECTION ROAD TEM – DDY OVERPASS BRIDGE EARTHWORK EDGING AND EARTHWORK WALL FABRICATIONS (2012-2013)
TCDD – HIGH SPEED TRAIN OVERPASS BRIDGE – SINCAN OSB 5TH STAGE – 6TH STAGE (2013)
DHMİ – MEHMAT ALI ÜNAL İNŞAAT – ATATÜRK AIRPORT ENGINE TEST APRON BEHIND EARTH REINFORCED WALL CONSTRUCTION (2013)
T.C. MINISTRY OF TRANSPORTATION GENERAL DIRECTORATE OF HIGHWAYS GENERAL DIRECTORATE OF HIGHWAYS 7TH REGION – AMASYA RING ROAD UNIVERSITY FRONT INTERSECTION EARTH REINFORCED EDGING AND EARTH REINFORCED WALL CONSTRUCTION (2013)
TCDD – ARIFIYE KARAÇAM 8.2 KM NEW SECOND LINE RAILWAY INFRASTRUCTURE CONSTRUCTION WORK EARTHWORK WALL CONSTRUCTION (2013)
ŞIŞLI TERAKKI HIGH SCHOOL – TRC İNŞAAT – CONSTRUCTION OF EARTH REINFORCED WALL WITHIN THE SCOPE OF ŞIŞLI TERAKKI HIGH SCHOOL TEPEÖREN CAMPUS CONSTRUCTION WORK
THY NEW CARGO TERMINAL EARTH REINFORCED WALLS ISTANBUL BUS A.Ş KURTKÖY TERMINAL EARTH REINFORCED WALL MANUFACTURING
ISKENDERUN ORGANIZED INDUSTRIAL ZONE INTERSECTION EARTH REINFORCED WALL MANUFACTURING
PETKIM-PETLIM PORT CONSTRUCTION EARTH REINFORCED WALL CONSTRUCTION
SILIFKE-TASUCU -OVACIK 13.BL.HD ROAD KM 0+000-9+270 AND 93+312-121+835 SECTIONS ROAD CONSTRUCTION EARTHWORKS
HIDROMEK SINCAN ORG. SAN. 6TH STAGE FACTORY CONSTRUCTION VARIOUS EARTH REINFORCED WALL PRODUCTIONS
TRABZON PELITLI JUNCTION EARTH REINFORCED CONCRETE WALL AND EARTH REINFORCED EDGING
T.C MINISTRY OF TRANSPORTATION HIGHWAYS 1ST REGIONAL DIRECTORATE KAYNARCA KARASU ROAD KM : 15+000 – 15+500, KM:21+000-35+385 AND ADAPAZARI KARASU ROAD KM:54+900-56+880
T.C MINISTRY OF TRANSPORTATION HIGHWAYS 10TH REGIONAL MD. SILVERHANE PIRAHMET JUNCTION EARTHWORK WALL CONSTRUCTION
RMİ RÖNESANS MEDICAL CONSTRUCTION ADANA INTEGRATED HEALTH CAMPUS EARTH REINFORCED WALL CONSTRUCTION
T.C MINISTRY OF TRANSPORTATION HIGHWAYS 1ST REGIONAL MD. IZMIT BUS STATION INTERSECTION EARTH REINFORCED WALL CONSTRUCTION
T.C MINISTRY OF TRANSPORTATION HIGHWAYS 10TH REGIONAL MD. – CENGIZ İNŞAAT – TRABZON ERZURUM ROAD PANELTON MANUFACTURING
CONSTRUCTION OF 3RD AND 4TH LINE BETWEEN TCDD ADANA AND MERSIN EARTH REINFORCED WALL CONSTRUCTION
T.C MINISTRY OF TRANSPORTATION HIGHWAYS 5TH REGIONAL MD. ANDIRIN GÖKSUN STATE ROAD EARTHWORK WALL CONSTRUCTION
T.C MINISTRY OF TRANSPORTATION HIGHWAYS 5TH REGIONAL MD. SILIFKE MUT STATE ROAD EARTHWORK WALL CONSTRUCTION
NORTH MARMARA HIGHWAY – KALYON CONSTRUCTION – EARTH REINFORCED WALL CONSTRUCTION
CONSTRUCTION OF 3RD AND 4TH LINE BETWEEN TCDD ADANA AND MERSIN EARTH REINFORCED WALL CONSTRUCTION
NEVSEHIR HACIBEKTAS ÇILEHANE BRIDGE INTERSECTION /İMAŞ ENERGY
SINCAN OSB PARCEL EDGE WALL WORKS/ SINCAN OSB
ADANA CITY HOSPITAL / RMI RÖNESANS
SILVERHANE STATE HOSPITAL ROAD CONSTRUCTION/ARAS CONSTRUCTION
ADANA MERSIN HIGH SPEED TRAIN LINE CONSTRUCTION/ NUHOĞLU-DALGIÇLAR-ULAŞIM AŞ. PARTNERSHIP
CONSTRUCTION OF BRIDGE INTERSECTION IN FRONT OF IZMIT BUS STATION
T.C. HIGHWAYS 5TH REGION ANAMUR T6-T7 WALL CONSTRUCTION WORK/FEZA UNDERTAKING AŞ.
SILVERHANE PIRAHMET BRIDGE/IREM CONSTRUCTION MAKIS PARTNERSHIP
ZONGULDAK ÇAYCUMA DDY JUNCTION -MENGA İNŞAAT LTD. ŞTI. 1ST BRIDGE WORK
T.C. HIGHWAYS 5TH REGION SİLİFKE MUT ROAD CONSTRUCTION WORK-TOPRACRAME WALL FABRICATIONS/ HCG ATACAN AKSOY
T.C. HIGHWAYS 10TH REGION TRABZON YOMRA KASHÜSTÜ CITY PASS TUNNEL LINING WORK /SANCAR CONSTRUCTION
T.C. HIGHWAYS 5TH REGION HEROMARAŞ GÖKSUN ROAD CONSTRUCTION WORK/GÜL İNŞAAT MADENCİLİK LTD.ŞTI
KRP HIGHWAY CONSTRUCTION-NEW AIRPORT INTERCHANGE PRECAST PRODUCTIONS
ÇELEBİ GROUP ARSİN ORGANIZED INDUSTRY- REINFORCED EARTH WALL PRODUCTIONS- PRIVATE SECTOR
CENGİZ İNŞAAT NORTH MARMARA HIGHWAY CONSTRUCTION PRECAST FACADE PANEL COATING WORK
DALGICLAR NUHOGLU TRANSPORTATION AŞ PARTNERSHIP ADANA MERSIN DDY BRIDGES
BOLU GÖYNÜK CITY CROSSING INTERCHANGE CONSTRUCTION WORK – İREM İNŞAAT A.Ş
ISBİR GENERATOR BALIKESİR OSB FACTORY WALL WORK – DEA YAPI
T.C. HIGHWAYS 10TH REGION GÜMÜŞHANE TORUL-KÖSDERE EARTH REINFORCED WALL PRODUCTIONS CENGİZ İNŞAAT A.Ş
NORTH MARMARA HIGHWAY-CRP HIGHWAY CONSTRUCTION-NEW AIRPORT INTERCHANGE PILE FRONT PRECAST WORKS – KALYON İNŞAAT A.Ş
NORTH MARMARA HIGHWAY-CRP HIGHWAY CONSTRUCTION-NEW AIRPORT EARTH REINFORCED WALL FABRICATIONS – KALYON İNŞAAT A.Ş
ZONGULDAK ÇAYCUMA DDY JUNCTION-MENGA CONSTRUCTION LTD. ŞTI. 2ND BRIDGE WORKS
ŞANLIURFA MUNICIPALITY A.BADILLI JUNCTION. EARTH REINFORCED WALL PRODUCTIONS – BELTAS
T.C. HIGHWAYS 5TH REGION GAZIANTEP HASAN KALYONCU UNI. INTERSECTION EARTH REINFORCED WALL PRODUCTIONS
T.C. HIGHWAYS 5TH REGION GAZIANTEP NIZIP-BIRECIK ROAD KM:33+574-33+810 EARTHWORK WALL CONSTRUCTION – AVOS CONSTRUCTION
T.C. HIGHWAYS 5TH GAZIANTEP CITY HOSPITAL JUNCTION GAZIANTEP RING ROAD KM: 22+664 EARTH REINFORCED WALL FABRICATIONS – EKOS GROUP
T.C. HIGHWAYS 5TH REGION SİLIFKE MUT ROAD CONSTRUCTION WORK-TOPRACRAME WALL FABRICATIONS-HCG CONSTRUCTION
BALIKESIR BEYAZ FILO AUTO RENTAL FACTORY CONSTRUCTION OF EARTH REINFORCED PERIMETER WALLS.
T.C KOCAELİ KOCAELİ METROPOLITAN MUNICIPALITY IZMIT REGIONAL HOSPITAL TRAMWAY BRIDGE – EARTH REINFORCED CONCRETE WALL PRODUCTIONS – EZE İNŞAAT
T.C. HIGHWAYS 5TH REGION KAHRAMANMARAŞ GÖKSUN ROAD CONSTRUCTION WORK/ATACAN AKSOY İNŞAAT A.Ş
T.C. HIGHWAYS 10TH REGION TRABZON ZIGANA TUNNEL EXIT EARTHWORKS – CENGİZ İNŞAAT A.Ş
T.C.HIGHWAYS – DLSY 1915 ÇANAKKALE BRIDGE HIGHWAY 9 BRIDGE INTERCHANGE EARTHWORKS
GAZIANTEP CITY HOSPITAL INTERSECTION CONSTRUCTION WORK,
T.C.GAZİANTEP METROPOLITAN MUNICIPALITY – HASAN KALYONCU UNIVERSITY INTERSECTION EARTHWORKS
T.C. HIGHWAYS- IZMIT KANDIRA DIVIDED ROAD KM : 0+000 – 37+418.00 AND AGVA- KANDIRA-KAYNARCA ROAD EARTHWORKS – KALYON İNŞAAT A.Ş.
T.C. HIGHWAYS 14TH REGION AYVACIK-KÜÇÜKKUYU ROAD KM : 10+700-17+642.23 BETWEEN EARTHWORKS – KALYON İNŞAAT A.Ş.
T.C KOCAELİ KOCAELİ BÜYÜKŞEHİR MUNICIPALITY İZMİT REGIONAL HOSPITAL TRAMWAY BRIDGE-PREKAST PANEL COATING (PILE FRONT COATING) – EZE İNŞAAT
T.C ŞANLIURFA MUNICIPALITY ABIDE JUNCTION EARTH REINFORCED WALL CONSTRUCTION – GÜRBAĞ İNŞAAT
TARSUS ORGANIZED INDUSTRIAL ZONE KIZILKAYA AGRICULTURE FACTORY BUILDING PERIMETER RETAINING WALL PRODUCTIONS
T.C. HIGHWAYS 17TH REGIONAL DIRECTORATE EDİRNE-PAZARKULE HIGHWAY CONNECTION ROAD EARTHWORKS